Traffic Flow Revision Update

One of the long outstanding projects we have is the revision of the traffic flow at the both the entrance and the within the car park.

We are pleased to share that all the work orders have been approved for the revised traffic flows at both Post 1 and 2.

As well as moving the barriers, ironwork, cameras etc, new signage will also be installed which will include signage attached to the barriers and signs clearly indicating which lane people should take.

Owing to multiple contractors being involved we are awaiting a confirmed installation date which should be in around 2-3 weeks time.

The revised flow at the guardhouse is available here: Post 1&2 Revised Flow

The plan to shift visitor parking entry to Post 1 is still being finalised however its likely to happen once the entrance flows have been changed.

In addition to this a revised traffic flow plan for the car park has been finalised which will remove the errors with the existing design. The signage plan is currently being worked upon and should be completed within the next few weeks following which the work orders can be issued.

The proposed car park flow change will be shared asap.

The revised signage will hopefully address the current issues where by visitors parking cannot be found, there are no clear exit signs and no clear directions to other levels.

There are some ideas around the painting of all pillars and creating zones however these are likely to be out of scope of the current works and will be looked at in the future.