Its been some time since a formal update on the lobby doors/linkbridge gates project has been made although adhoc updates have been made via the Facebook group.
Following many unfortunate delays and some design modifications, the ironwork and access control system has been installed and is currently undergoing testing to iron out any issues.
Additional signage has been installed at all doors and gates with the Security team contact number listed should anybody require assistance.
Unfortunately we have found that in several blocks the lobby area plaster ceiling is sagging and interfering with the doors. As a result we will need to rectify this before the system can be switched on and we are hopeful to get this completed in the new few weeks.
Several residents have raised concerns over the lack safety markings on the doors and we can confirm that these will be fitted before the system goes live.
**Update 14/10**
Unfortunately the quotations presented to the JMC did not contain the required dimensions/quantity and delays have occurred in sourcing a quote from some other suggested contractors. The JMC are extremely frustrated with the situation and are pressing the Management Office team to get this resolved asap.