Sunday, October 28, 2012

Closing of Gate 3 from 1st Nov 2012

Referring to the recent concluded 4th agm held on 20th October 2012, to help improve security gate 3 (near block B) will be closed for security reason after 12.00 am midnight.  The gate will be re open again at 6.00 am.

All vehicles or motorcycles parking below ground level car park of phase 2 who wish to drive out of the building car park after midnight, must use the gate 1 exit (near block H).

Walk-in residents from gate 3 will have to use nearby gate 2 entrance to come into the building during this period.

Thanks for your cooperation.

Management services

3 comments:

  1. It was not very smart for the developer to design such a confusing entry / exit situation for Phase 2. As a matter of fact, there is a lot to be desired from the developer. After we get our money back in full from them, shall we all picket in front of their sales office when they launch their adjacent development?

    ReplyDelete
  2. Yup, this morning at about 8am, I saw the security guard opening the gate to one car without even checking his card. I then asked the guard why & he couldn't even speak English.

    ReplyDelete
  3. Thanks for teh feedback. Have you reported this to the management office?

    ReplyDelete