A survey of all roofs was performed by several contractors and it was found that Towers F, C & A required major repairs in that order of urgency.
A significant investment was required and after a lengthy tender process a contractor was appointed.
The contractor (JCi Waterproofing) will apply a new Acrylic Membrane after preparing the existing surface and repairing the cracks with hydraulic cement. The work carries a 5 year workman warranty and a 5 year product warranty.
More photos of the works can be found here: Tower F Roof Repairs
Other Towers are being monitored on a regular basis for similar issues.
No comments:
Post a Comment