Today a JMC member accompanied the Building Manager and maintenance team whilst they were checking that the water supply had resumed in all blocks.
Water from Syabas enters through these pipe
The pump room for towers A & B
The pump room with the suction tanks on the left and straight ahead. Water enters here from the main Syabas pipe and is then pumped up to the roof top tanks from the suction tank.
The control panel and supply alarm
One of the 4 roof top tanks on Tower A. This tank was full with depth of approximately 2.6 m
An adjacent tank
The tanks are hidden behind the grille
A view of the construction taking place next to Riana Green East from roof of Tower A
A great view of our well kept pool and surrounding areas from the roof of Tower A
Thanks for the update.
ReplyDeleteLooking forward to hear for the new update (every week perhaps) about availability of our water supply during Water Disruption period.