We are pleased to announce that the contractor for the Ironwork and lobby doors has finally be appointed and work should commence in the next 2 weeks.
The CCTV covering these many points is now operational although some adjustments will probably be needed once the everything is installed.
Once everything is installed it will ensure a greater level of access control to each block and hopefully provide a much safer environment for us to live in.
No comments:
Post a Comment